Field Notes

Notes and photos from interior fit-out work.

Stairwell

Stair handrail

Temporary rails, a yellow cap on every clamp. Fewer bruises.

Board at the steel

Board at a bolted beamFire-rated boards

Type Z board against the steel. Each bolted joint means notching a sheet by hand.

Around the ducts

Insulated duct and bracketBoard cut around a column

Ducts are wrapped before we board, so every hanger gets its own cutout. Measure twice.

Studs up

Frames standing, board comes next week. The lift has been busy all day.

Material day

Steel stud bundlesStuds sorted by size

Studs and runners arrive in taped bundles. Sort by length first; it saves walking all week.